INALSA (Insular de Aguas de Lanzarote SA) has awarded SANJOSE Ingeniería y Construcción industrial the execution works of the Substation 20/66 KV Water Consortium and the High Voltage Line 66 KV, for the evacuation of the Teguise I, San Bartolomé and Arrecife, in the municipality of San Bartolomé, with connection to the future Callejones Substation, which is the access point to the network that has been determined by Red Eléctrica de España for the three wind farms that are programmed.