INTERNATIONAL AIRPORT OF DULLES, VIRGINIA (USA)

 

Execution of a new basement for mechanical facilities at Terminal T East.

 

The project included the demolition of the provisional access ramp to the terminal building and the replacement of access way from Street A, located at aircraft transfer area, to the east of the main terminal building.

 

Permanent and temporary installation of flooring at aircraft parking area, sub-base material, drainage system and signalling equipment.

 

Execution of access stairway at flight strip level and ventilation valves. Supply and installation of air conditioning units, supply lines, electrical substations and connection to existing and future facilities.

Contact   |   Legal Notice   |   Cookies




Contactar   |   Aviso legal   |   Uso de cookies