EL POZO FACTORY IN ALHAMA DE MURCIA (SPAIN)
Design, supply and installation of all production equipment and networks distribution by armorinox systems, compressed air, steam and condensates, osmotic water, hot water at 80º C and 45º C, water for pressure washing (25 bar), vacuum systems, air conditioning and fire protection systems. It is a new 4 storey building within the food complex of El Pozo in Alhama de Murcia.
> Engineering and project. GSJ Solutions.
> Construction. SANJOSE Constructora.