RESTORATION AND MAINTENANCE OF THE ROAD FROM DILI - TIBAR - LIQUICA (EAST TIMOR)
> Length. 28.7 km.
Works shall start at kilometre point 6.8 of the existing road (at the outskirts of the capital city Dili), which has one of the highest traffic flows of non-urban roads within the country and constitutes one of the most important communication routes linking Timor Leste with Indonesia.
The existing road has a width of 4 meters and the new route will cover a minimum width of 6 meters arranged into two lanes (one in each direction) plus two shoulders of 1 meter each.
The concerning road is a coastal route between the sea and rock formations with steep gradients. The existing road has slope stability problems in several locations which require different and various actions throughout its entire path.